March 7, 2020|
Posted by: sait2020
POWER T.E.S.
Installed the new power supply solar panels and environmentally mod. T.E.S. at Brenner (BZ) in November 2014. The cathodic protection system was installed for the protection of a pipeline transport gas placed parallel to the rail network Italy-Austria. The cathodic […]